Intergas HRE 36/40 Paarameters - OT R8810
Posted: Sat Nov 14, 2020 3:17 pm
Intergas HRE 36/10 , R8810 Bridge 2 cotrollers 22 HR92
Hi,
My self installed, professionally commissioned system has been running swimmingly. for three years.
Settings for the boiler Parameter C has has always been set to 1= Step Modulation during CH Operation.
Question : Why not set parameter C to 2= CH output controlled by OT Controller?
Thanks if anyone can enlighten me.
Hi,
My self installed, professionally commissioned system has been running swimmingly. for three years.
Settings for the boiler Parameter C has has always been set to 1= Step Modulation during CH Operation.
Question : Why not set parameter C to 2= CH output controlled by OT Controller?
Thanks if anyone can enlighten me.